A proven track record assessing subsurface conditions, designing prudently for difficult ground, and delivering cost-effective solutions when construction turns up surprises.

Sound answers to
difficult ground.

BECC has built an excellent track record on three things: proper assessment of subsurface conditions during exploration, an innovative but prudent design approach to difficult ground, and sound, cost-effective solutions when adverse situations arise during construction.

Request a Proposal

Services Offered.

A full range of geotechnical capabilities, from subsurface exploration to forensic engineering.

Subsurface Exploration & Investigation
Shallow Foundation Designs
Below-Grade Retaining System Design
Slope Stability Analysis
Deep Foundation Design
Lateral Force Analysis
Pavement Design (Flexible and Rigid)
Airport Pavement Design and Analysis
Settlement Projections
Sinkhole Studies
Earth Dam Design
Excavation Shoring Design
Professional Witness and Forensic Engineering

Inside a site evaluation.

The basic components we cover when evaluating a site for geotechnical work.

01
Basic geologic, geotechnical, and subsurface data
02
Excavation conditions and methods
03
Foundation requirements and methods
04
Pavement design evaluation
05
Project specification input for earthwork and foundations
06
Special design requirements

A report you can
act on.

The typical turnaround for a complete geotechnical report, after field and laboratory work, is about one week. A built-in quality assurance function keeps every report complete, timely, and accurate, with peer review and consultation running throughout so the recommendations stay practical, economical, and innovative.

~1 Week
Typical Report Turnaround
1

Drafted

Prepared by our project engineers and geologists.

2

Reviewed

Checked by the responsible senior engineer.

3

Finalized

A final review with our principal engineer before the report is issued.